![]() In April 2020, the Phase 2 contract was awarded to Callan Marine Ltd., and is currently under construction, deepening and widening the channel from Harbor Island to 2.7 miles past the La Quinta Junction and includes Ingleside. ![]() GLDD completed the first phase of the CIP on time in March 2020, deepening and widening the waterway from the Gulf of Mexico to Harbor Island. ![]() Phase 3 will extend west of the La Quinta Junction through the Chemical Turning Basin in the Port’s Inner Harbor. The four-phase infrastructure project will increase the Corpus Christi Ship Channel depth from -47 feet Mean Lower Low Water (MLLW) to -54 feet MLLW and widen it to 530 feet, with an additional 400 feet of barge shelves. ( GLDD), to complete the third phase of the landmark Port of Corpus Christi Ship Channel Improvement Project (CIP). Army Corps of Engineers ( USACE) on Friday awarded a $139 million construction contract to Great Lakes Dredge & Dock Company, LLC. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |